[an error occurred while processing this directive] [an error occurred while processing this directive] [an error occurred while processing this directive] [an error occurred while processing this directive] [an error occurred while processing this directive] [an error occurred while processing this directive] [an error occurred while processing this directive] [an error occurred while processing this directive]Industrial enterprises
Energoservice Company profileLicenses and certificatesPress-centreVacanciesContacts Ðóññêàÿ âåðñèÿ
[an error occurred while processing this directive] [an error occurred while processing this directive]

«ES-Energy» software system consists of the components required for the development of c power meters for enterprises of the wholesale and retail markets of electric power and meets the requirements of the system operator related to the exchange of telecontrol information, and SCADA systems development.
[an error occurred while processing this directive] [an error occurred while processing this directive]

Industrial enterprises

Kotlas pulp-and-paper mill:

  • design and installation of protection panels for generators of 30 and 60 MW with application of Sepam 1000 + microprocessor protection system and PRISMA Ð cabinets of series 80;

  • design and installation of protection panels for bus-bars of the main switch yard of 6 kV with application of Sepam 1000 + microprocessor protection system of series 20 and 40;

  • reconstruction of 6 kV cubicles of boilers at CHP–1 with application of BB/TEL vacuum circuit breakers and Sepam 1000 + microprocessor relay protection system of series 20 and 40.

Arkhangelsk pulp-and-paper mill:

  • modernization of switching equipmen of 6 kV and installation of BB/TEL vacuum switches and SEPAM 1000 + digital protection system;

  • installation and modernization of new switching equipmen of 6 kV;

  • design and installation of relay protection panels for generators generators with application of Sepam 1000 + microprocessor protection system and PRISMA Ð rackmount cabinets of series 80;

  • installation of arc short protection of switching equipmen at CHP–1 and CHP–3 with application of OVOD-M fiber-optic arc protection systems manufactured by Joint-Stock Company «PROEL»;

  • package works at 2500/6/0,6 transformer substation equipped with dry transformers and 0,4 kV switching equipmen with application of «À» equipment;

  • modernization of 0,4 kV switching equipmen;

  • commissioning and adjustment of automatic air supply system, fire pumps, frequency converters, monitors and automated devices with more than 200 engines, «À» automation frequency actuator.

Savinsk cement plant: reconstruction of 6 kV Sachsenwerk switching equipment containing 21 cubicles of transformer substation with application of BB/TEL vacuum circuit breakers and SEPAM 1000 + relay protection. [an error occurred while processing this directive] [an error occurred while processing this directive]


Site map
© 1992—2024 JSC «Engineering Centre «Energoservice»
26 Kotlasskaya St., Arkhangelsk, 163046

E-mail: info@ens.ru

Tel.: (8182) 64-60-00, 65-75-65
Fax: (8182) 23-69-55
Site designArtil.ru