[an error occurred while processing this directive] [an error occurred while processing this directive] [an error occurred while processing this directive] [an error occurred while processing this directive] [an error occurred while processing this directive] [an error occurred while processing this directive] [an error occurred while processing this directive] [an error occurred while processing this directive]Organizations
Energoservice Company profileLicenses and certificatesPress-centreVacanciesContacts Ðóññêàÿ âåðñèÿ
[an error occurred while processing this directive] [an error occurred while processing this directive]

«ES-Energy» software system consists of the components required for the development of c power meters for enterprises of the wholesale and retail markets of electric power and meets the requirements of the system operator related to the exchange of telecontrol information, and SCADA systems development.
[an error occurred while processing this directive] [an error occurred while processing this directive]

Organizations

The Arkhangelsk Region Department of the Federal Treasury: (reconstruction of power supply system: installation of block complete two-transformer substation 2BCTS2õ630 kVA, modernization of lead-in switching equipment with PRISMA cabinets).

The Arkhangelsk Drama Theatre: (reconstruction of electric power supply system: installation of 2,5 MVA dry transformers, switch yards of 6 and 0,4 kV with application of equipment manufactured by Schneider Electric, Canalis main-line power tracks with high power capacity).

Office building of Arkhenergo: work package on reconstruction of:

  • lead-in switch yard with application of PRISMA cabinets;
  • systems of uninterruptable power supply of control room (UPS 2õ30 kVA and 3õ8 kVA with concurrent operation blocks manufactured by Powerware, General Electric, Schneider Electric).

Northern Shipping Company, Alviz, Arkhavtodor, Artelecom, Telecom XI, Severalmaz, Administration of the Arkhangelsk Region, the Arkhangelsk Region Council: work package on design and installation of uninterruptable power supply with application of uninterruptable power supply and diesel-generator sets.

The Chelyabinsk Region Branch of the Central Bank of the Russian Federation: work package on reconstruction of the lead-in switching equipment of the building, distributive electrical networks, system of uninterruptable power supply with application of two concurrent Powerware Plus UPS with capacity of 160 kVA.

The Arkhangelsk Region Branch of the Central Bank of the Russian Federation: work package related to the system of uninterruptable power supply with application of 22 «Caterpillar» emergency diesel — generating sets with capacity of 10, 20, 50, 110, 220 kVA and UPS; reconstruction of the lead-in switch yard, distributive grid.

SibNeft: design of independent power park in Nagorny settlement, Beringovsky district of Chukotski Area (power plant comprising five blocks consisting of diesel-generator set module of 0,4 kV and container-type module KTP 630 kVA 6/0,4 kV). [an error occurred while processing this directive] [an error occurred while processing this directive]


Site map
© 1992—2024 JSC «Engineering Centre «Energoservice»
26 Kotlasskaya St., Arkhangelsk, 163046

E-mail: info@ens.ru

Tel.: (8182) 64-60-00, 65-75-65
Fax: (8182) 23-69-55
Site designArtil.ru